国产91精品一区二区麻豆网站_高清一区二区亚洲欧美日韩_在线天堂av无码av在线aⅴ首页_亚洲欧美激情在线播放_免费看隐私jk美女秘 网站_精品无码AⅤ一区二区三区不卡_最近韩国高清免费观看视频大全_av天堂东京热无码_老司機中文字幕無碼網站_亚洲污污视频在线观看

 
中文版 | English | 日本語    86-769-82020528
 
Solution Category
Precision machining part
Precision gear turbo
Precision axis
Aluminum castings
DongGuan Unite Industry Co., Ltd
Add:Shuibian Industrial District, Hengli Town, DongGuan City, Guangdong province China
Tel:86-769-82020528
Fax:86-769-82020518
E-mail:peifei@uniteyd.com
    
Http:0376com.cn
Current Location:Home » Solution » Aluminum castings » Long axis - processing piston rod and processing linear optical axis is the same, how to choose the right blank?

Long axis - processing piston rod and processing linear optical axis is the same, how to choose the right blank?

Edit:admin   Browse:885  Date:2017-03-17

The first is to determine the type of the blank. In order to ensure the piston rod after forming has good quality and excellent performance, the blank is made of 38CrMoAlA nitrided alloy structural steel, so it has high center strength, excellent wear resistance and fatigue resistance, heat treatment deformation is very small, can meet the piston rod transport. Dynamic needs. The major axis
In order to determine the guide of linear optical axis by linear speed and rotation speed, the large linear speed needed to be considered can be calculated according to a certain formula. If the linear optical guide and synchronous belt are to be used together, the key is to solve the problem that the transmission guide is on the side and the roller is below.
There are two specific solutions, one is to use a combination of double guideways, the guide rail is equipped with integrated drive teeth, and four roller bearings composed of a sliding plate, so that the roller guide can be used with the track, and installation is more convenient.
To determine the length of a straight optical axis according to actual needs, we must calculate all the allowances. When the basic information of the linear optical axis is determined, ask the manufacturer's price, payment conditions and delivery time to ensure that the work can be carried out smoothly.

Previous:Is it necessary for heat treatment of long axis optical axis?
Next:It is necessary to install valves (ball valves or globe valves) and check valves on the discharge side of the long shaft vertical long shaft pump.
Print | Close
 
Contact
86-769-82020518
86-769-82020518
peifei@uniteyd.com
Shuibian Industrial District, Hengli Town, DongGuan City, Guangdong province China
Feedback
 
 
 
CopyRight©DongGuan Unite Industry Co., Ltd   Design:0086zg   Admin   Mail   粵ICP備09093645號